Northeast Industrial Plant

Abide was tasked with the challenge to remove friable asbestos containing caulk from exterior wall panels while under containment.  As you can see from the photos, an extensive containment was put in place and broken down and re-installed on each side of the building.  Abide was successful in removing the caulk without any releases to [...]

Northeast Industrial Plant2019-02-20T14:28:56-07:00

SCHOTT North America

Before Before After Remediation After Remediation Abide was contracted to remediate mold on surfaces covering approximately 3200 square feet on three walls.  All work was done under a 4-mil poly containment with negative air HEPA filtration to establish negative air flow.  The staining and/or mold growth on masonry blocks [...]

SCHOTT North America2019-02-20T14:28:57-07:00